Breaking Regulation & Contractor Economics Analysis•Regulations, Policy & SafetyGreg Abbott Froze Texas Data-Center Permits. A 474-GW Power Queue Is Now an Electrical-Contractor Story.Texas has halted data-center permits and related state approvals until ERCOT completes a sweeping audit of grid, water and community impacts. For electrical, HVAC and controls contractors, the important question is not whether AI infrastructure disappears — it is how project risk, power generation, cooling and interconnection scope change before work can move again.TradeVulcan Dispatch Editorial Desk•Sep 22, 2026•14 min
Breaking Regulation & Contractor Economics Analysis•Regulations, Policy & SafetyThe House Voted 417–3 on Data-Center Power Costs. Trump Wants the Senate to Move Next.The House passed the Ratepayer Protection Act 417–3, the Senate hit an impasse, and President Donald Trump says he is talking with Majority Leader John Thune about bringing the issue to the floor. The bill would make states consider whether 100-megawatt-plus data centers should bear the incremental grid-upgrade costs created to serve them—a fight that reaches residential electricity bills, electrification sales and the electrical construction boom.TradeVulcan Dispatch Editorial Desk•Sep 19, 2026•13 min